Application maintenance management of hoisting……

3
Application maintenance management of hoisting……

Column:Company News

Time:2023-03-08

(1) The sling should be reasonably selected based on the lifting weight or the appearance of the heavy object.

(2) The sling must be inspected when in use. It can only be used after checking that everything is normal. Inspections and records must be carried out every day.

(3) When hoisting large heavy objects, you must first test the hoisting. The height from the ground should not be higher than 0.5 meters. The hoisting can only be started after the inspection and confirmation.

(4) Hoisting and rigging equipment cannot be piled randomly. After use, they should be placed on special fixed brackets. Overload use or operation is prohibited.

(5) The rigging should be regularly oiled and maintained, and nylon, fiber slings, etc. are not allowed to be mixed with steel wire ropes.

(6) The lifting and rigging management plan and management regulations should be continuously improved, and detailed records should be kept, including rated lifting capacity, production number, manufacturing date, manufacturer name, model specifications, etc.

(7) The daily safety management of slings should include dedicated management, use, designated storage, regular inspection and timely destruction, and the maintenance and upkeep of slings should be done well.

(8) The application conditions of the hoisting and rigging used on site should be checked. Once aging, broken strands, tears, etc. are found, they should be stopped immediately and destroyed immediately. It is prohibited to hoist objects with edges and corners.

(9) The sling must be operated safely. Do not drag it while working to prevent damage to the sling; goods cannot be suspended for a long time; care should be taken to store it away from light and clean the sling on time.